Summary: Dispatchers and field personnel coordinated the placement of a temporary sign at an unspecified location. The conversation included confirming whether a temporary sign was installed or if the sign department needed to respond immediately. A unit identified as 9557-2 was involved in handling the sign placement. The situation was resolved with the understanding that the sign department could address the issue in the morning or when available, as there was no urgent risk.