Left half of ST ramp closed at Interchange 4 on NJ Turnpike, Penns Grove NJ


Maintenance crews closed the left half of the ST ramp at Interchange 4 on the New Jersey Turnpike for scheduled work. Traffic management measures and caution advisories are in place on the ramp for safety during the closure.
Audio|Source: New Jersey Turnpike Authority and NJDOT
01:31
Transcript:
00:00
Mark, we are ready for the slowdown for the left half at the STRamp Interchange 4.
00:07
Resey, going to head your way, I'll let you know want to get it started.
00:12
Reesie, thanks.
00:13
Here we got it, Snarda.
00:17
Appreciate thanks.
00:23
Joe, are you going to need us for the TN?
00:28
I don't think I will.
00:30
Really?
00:37
7.3, 898. If you need, there's going to be a sub there. I can just pass long air information.
00:42
And you can hold to whatever you need.
00:46
Ritchie, thanks.
00:47
And if you guys insist, I'll use it. If not,
00:50
I should be good without it.
00:53
Reaching. 8.
00:59
Received, traffic's release.
01:01
Operations, 898.
01:04
Okay.
01:07
The advised maintenance has installed a left half closing interchange four on the ST ramp.
01:14
If you can, can you just activate some BMS ports northbound prior just advising caution exiting interchange four and if closing is out till three.
01:29
Thank you, Kevin, thank you guys.
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
Location mentioned:
Hmshost Corporation, Mile Post 5, 4 NJ Tpke, Penns Grove, NJ 08069
Correct
Incorrect