Daily river closure for dredging at Chain of Rocks canal, Augusta MO


Dredging at the Chain of Rocks canal will cause daily river closures for navigation from 5 p.m. to 8 p.m. starting September 19, 2025, until October 6, 2025. The river will be open for transit from 8 a.m. to 5 p.m. Locks will manage vessel traffic during this period.
Audio|Source: Mississippi River Marine St Louis Area
00:52
Transcript:
00:00
The U.S. Army Corps of Engineers dredgellets will start dredging at the lower chain of rocks, canal, entrance, mile marker 184, up from Mississippi River on Friday evening, September 19,
00:09
2025 at 1700, and is estimated to be complete on October 6, 2025,
00:14
due to the width of the channel at mile marker 184, and for safe and efficient dredging operations, a knotty river closure for navigation toes has been coordinated with industry and the U.S. Coast Guard. The following daily schedule will be used. River closed for dredging, 1700-20700.
00:29
River open for transit 0,700 to 1,700.
00:32
If needed, the U.S. Army Corps engineer dredge goets can be contacted on Marine Channel's 13 or 16.
00:38
Locks 27 will manage the traffic queue for efficient movement past the dredge goets and through locks 27.
00:43
Contact locks 27 on Marine Channel 12.
00:46
All navigation interests should be alert for and abide by any special instructions that may be issued by the lockmaster.
00:52
Break.
Disclaimer:
This transcript was automatically generated and may contain inaccuracies. Please verify the information independently.
Location mentioned:
Lower St, Augusta, MO 63332
Correct
Incorrect